Post Construction Anti Termite Treatment- For ready structure (Drill, Fill , Seal & Spray)
- 1.Drilling : (Inside premises)
The drilling will be done to the junction of wall and floor at junction or to the skirting level, drilling will be done to effective depth of 4 to 5 inches and 15 to 18 inches apart. For Outside premises-(Walls) Drilling will be done to effective depth of 9 inches and 1 feet apart to the wall and floor junction.
Lift pits, garden area will be treated by spraying on infested area. As these are sensitive areas where termite easily get access.
- 2. Filling : The holes are filled with anti termite chemical, the filling procedure is repeated two to three time to make effective chemical barrier against termite.
- 3. Sealing : The holes are sealed with white or black cement.
- 4. Spraying: The muddy channels made by termite will also treated by spraying and the channels are removed from infested place, then the minute holes are injected & Sprayed with anti termite solution.